More Links
Rowhouses downtown.
EmailPrint

CECP Post Installation

Info for: ResidentialCommercialEducationCommunityContractorsEconomic Development

Thank you for your interest in HG&E's Commercial Energy Conservation Program! After you recieve a contract from HG&E, please provide your installer with the applicable post-installation form before the service is complete to ensure all necessary information is obtained. The post installation form needs to be completed by your installer before payment is sent to confirm that eligible systems were installed, or eligible services were performed. Please leave the customer account number field blank when submitting this form. 

 

Central Air Conditioning System Post-Installation Form

Gas Heating Systems Post-Installation Form

Insulation, Air Sealing, Duct Sealing, Blower Door Tests Post-Installation Form

Domestic Hot Water System Post-Installation Form

Replacement Windows and Doors Post-Installation Form

Air Source Heat Pump System Post Installation Form

Please complete this form for air source heat pump system installations. If you'd prefer to print the form, please download the pdf version. 

Solar PV Post-Installation Form

Please complete this form for Solar PV systems. If you'd prefer to print the form, please download the pdf version

Lighting & Manufacturing Equipment Post-Installation Form

Please complete this form for lighting and manufacturing equipment. If you'd prefer to print the form, please download the pdf version

Back to Top

Customers

View or Pay Your BillView or Pay Your Bill
Outage CenterOutage Center

Contact Information

Customer Service
Email | (413) 536-9300